EasyManua.ls Logo

FERRI ZMT - Before Use or Putting into Service after a Long Peroid of Inactivity

Default Icon
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86
ZMT-ZMTE
Rev. 5.1
ROUTINE MAINTENANCE
07-Primo utilizzo o rimessa in servizio
7.8 Beforeuseorputtingintoserviceafteralongperoidofinactivity
Before using the machine for the rst time or after a long peroid of inactivity:
Check that the machine is not damaged;
Check that the mechanical parts are in good condition and free of rust;
Check the level of liquid in the hydraulic system;
Check the state of wear of the ails;
Check that the light bar and the electric system work;
Clean away any protective substances covering the moving parts;
Thoroughly grease all the moving parts;
Make sure that there are no leakages of oil from ttings or tubes;
Check that all the guards are positioned correctly;
Check that the system functions properly;
Protect all the electrical connections with anti-oxidants.

Table of Contents