44
ZMT-ZMTE
Rev. 5.1
TRANSPORT AND INSTALLATION
4.2
04-Rimozione imballo (ZM-ZMTE)
4.2 Removalofpackagingandpre-assembly
There is packaging available for the transport of the machine, which requires some pre-assembly operations to be
carried out before installation of the machine to the tractor.
FOR SAFETY REASONS IT IS STRICTLY FORBIDDEN TO USE THE MACHINE IN
CONDITIONS OTHER THAN THOSE RECOMMENDED.
WARNING
To perform the transport and assembly operations of the machine safely, use a fork lift truck and/or lifting device/hoist
of adequate capacity to carry the weight of the machine.
Assembly operations:
For transport reasons the machine is delivered packaged and partially disassembled inside a wooden box. The box
is designed to be transported by means of a fork-lift truck.
It is advisable to assign such handling operations to qualied and properly trained
personnel (sling operators, fork-lift operators, etc.).
CAUTION
1) Arrange the packaging on a at dry surface.
2) Use a hoist or a crane of adequate capacity and suitable ropes and chains to lift the machine and carry out all the
various handling stages. Before removing the metal wires that secure the dierent parts of the disassebled
machine, ensure the parts are xed using strips connected to a hoist to prevent them from falling during unpacking.