45
Rev. 5.1
ZMT-ZMTE
TRANSPORT AND INSTALLATION
4.3
4.4
04-Rimozione imballo (ZM-ZMTE)
3) Fasten the third point arc with a belt or chain of adequate capacity for lifting, before cutting the fastening metal
wires applied. Tighten the belt or chain to prevent the possibility of the piece falling. Insert the lifting hook into
the designed hole on the third point arc. Attach the third point arc, lifting it and resting it atly on the ground in
a safe place and in a safe position, so as to not hamper the assembly operations of the machine.
4) Remove the shaft, laid inside the machine frame and attached to it with metal ropes. Place it on a at surface in a
safe place so as to not hamper the assembly operations of the machine.