EasyManua.ls Logo

FISNAR DC100 MAX - Page 66

FISNAR DC100 MAX
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC100 MAX Digital Dispenser Operating Manual
© 2023 Fisnar - 66 - DC100 MAX Rev 4
Input Signal Definition
Pin #3 CC Initialize (Input):
- When connected to a GND pin the “CC Initialize” signal will be activated, resulting in the machine
dispense cycle being actuated.
o When in “PURGE or “TEACH”
mode, the machine will continue to be actuated (i.e.
Dispensing fluid) until “CC Initialize” signal is removed from the GND pin.
o When in “TIMED” or “TIME+” mode, the machine will continue to be actuated (i.e. Dispensing
fluid) until the set dispense time on the machine has been reached.
o When in “CYCLE” mode, the machine will continue to be actuated (i.e. Dispensing fluid) in a
looping cycle until “CC Initialize” signal is removed from the GND pin and then re-applied.
- A green LED light will light up above the button on the front panel of the controller, to identify
the machine is actuating a dispense cycle (i.e. Dispensing fluid).
Pin #4 Alarm In (Input):
- When connected to a GND pin the “Alarm In” signal will be activated, resulting in the “Alarm Out”
signal (Pin #6) being activated automatically.
- A pop-up message “Input Alarm” will also be displayed on the home screen
- It will not be possible to actuate a new dispense cycle until the “Alarm In” signal has been de-activated
and the machine reset by pressing the button or momentarily (two (2) seconds) activating pin
#16 of the I/O input circuit.
Pin #8 Start Signal IN 24V+ (Input):
-
When connected to an external 24V+ power supply, the “Start Signal IN 24V+” signal will be
activated, resulting in the machine dispense cycle being actuated.
o
When in “PURGE” or “TEACH” mode, the machine will continue to be actuated (i.e.
Dispensing fluid) until “CC Initialize” signal is removed from the GND pin.
o When in “TIMED” or “TIME+” mode, the machine will continue to be actuated (i.e. Dispensing
fluid) until the set dispense time on the machine has been reached.
o When in “CYCLE” mode, the machine will continue to be actuated (i.e. Dispensing fluid) in a
looping cycle until “CC Initialize” signal is removed from the GND pin and then re-applied.
- A green LED light will light up above the button on the front panel of the controller, to identify
the machine is actuating a dispense cycle (i.e. Dispensing fluid).
PLEASE READ: For the “Start Signal IN 24V+” signal to work correctly, “Start IN GND
(0V)” (pin #9) must be connected to an external GND (0V)