EasyManua.ls Logo

Fluke 5520A - Testing RS-232 UUT Port Operation Using Visual Basic

Fluke 5520A
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Remote Operation
Setting up the RS-232 UUT Port for Remote Control
5
5-19
The characters UUT_SEND <uut command> should have appeared as they were
entered. If they did not appear on the screen, the RS-232 interface between the PC
and 5520A Host port is not operating. Review the “RS-232 Host Port Setup
Procedure” and correct the problem.
4. If the UUT command does not execute, refer to step 3 of the “RS-232 UUT Port
Setup Procedure” procedure to verify the RS-232 UUT port parameters. Also check
the cable for UUT connection was a modem (not null modem) cable. Be sure your
command was entered correctly had the proper end-of-line character(s), if required.
5. When finished testing UUT commands, select the Exit command from the File menu
to close the Terminal accessory.
5-14. Testing RS-232 UUT Port Operation using Visual Basic
Complete the following procedure to test RS-232 UUT port operation via the RS-232
Host port using a Visual Basic test program. This procedure assumes you have already
completed Appendix D, “Creating a Visual Basic Test Program” to create the program
used for this test.
Complete the following procedure to test RS-232 operation using Visual Basic.
1. Complete the “RS-232 UUT Port Setup Procedure” earlier in this chapter to set up
the 5520A RS-232 UUT port to match the parameters of the UUT RS-232 port.
2. Complete “Testing RS-232 Host Port Operation using Visual Basic” to prepare the
Calibrator RS-232 Host port. After Step 6, return to this procedure and continue to
Step 3 below.
3. Click the Command3 button (below is typical). Observe the UUT responds to the
command you used when you completed Appendix D, “Creating a Visual Basic Test
Program.”
nn311f.bmp
If the UUT did not respond, check the RS-232 parameters set for the Calibrator UUT
port and set for the UUT port. Verify you used a modem (not null modem) cable for
the 5520A to UUT connection. Check the Visual Basic program to make sure the
UUT command was entered correctly, including the end-of-line character, if any.
4. Close the program by clicking the top-left corner and Close.

Table of Contents

Other manuals for Fluke 5520A

Related product manuals