EasyManua.ls Logo

Fronius Symo Hybrid 3.0-3-S - Settings: Load Management Configuration; Load Management Rules, Thresholds, and Duration

Fronius Symo Hybrid 3.0-3-S
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Settings - load management
Load manage-
ment
Energy management controlling priorities
If additional components (e.g. battery, Ohmpilot) are available in the system, the priorities
can be set here. Devices with a higher priority are activated first, followed by the others if
surplus energy is available.
Load management
Up to four different load management rules can be defined. If the thresholds are the
same, the rules are activated in sequence. During deactivation, it is the other way round;
the last IO switched on is the first to be switched off. If the thresholds are different, the IO
with the lowest threshold is switched on first, followed by the one with the second lowest
threshold and so on.
IOs which are controlled through the power produced are always at an advantage over
the battery and Ohmpilot. This means an IO can switch itself on, resulting in the battery
no longer being charged or the Ohmpilot no longer being activated
An IO is only activated or deactivated after 60 sec.
Control
- Control via Energy Manager deactivated.
- Control via Energy Manager is based on the power produced.
- Control via Energy Manager is based on surplus power (with feed-in limits). This
option can only be selected if a meter has been connected. Control via Energy
Manger is based on the amount of energy actually fed into the grid.
Thresholds
- on: For entering an effective power limit as of which the output is to be activated
- off: For entering an effective power limit as of which the output is to be deactivated.
Duration
- Field for activating the minimum running time per switch-on operation
- Field for specifying the minimum amount of time that the output should remain activ-
ated for per switch-on operation.
- Field for activating the maximum running time per day
- Field for specifying the maximum total amount of time that the output should be
activated for per day (allowing for several switch-on operations).
Desired duration
- Field for activating a desired running time
98

Table of Contents

Related product manuals