EasyManua.ls Logo

Fuji Electric FLD-1 - Page 140

Fuji Electric FLD-1
189 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INF-TN1FSC-E 131
(3) Before mounting the sensor to the pipe, apply grease evenly over the sensor unit and the absorb-
er unit that are to contact the pipe.
Absorber unit
Sensor unit
Grease
(4) Fasten the sensor with the belt checking the ow direction.
FSDP2, FSDP1 FSDP2, FSDP0
Flow direction
Flow direction
(5) After fastening the sensor to the pipe, screw to the left side, attach the sensor rmly to the pipe.
Screw

Table of Contents

Related product manuals