36 Operating manual RX300 S3
Installing/Removing the Server into/from the Rack Hardware Installation
3rd-Party Rack
Certain boundary conditions are to be fulfilled:
Installation dimensions (see the dimensions shown in figure 4 on page 37).
The operability of the safety mechanisms at the server e.g. stoppers or
holding back systems must be guaranteed.
The form of the rack support uprights must ensure the frontal screwing on of
the rails.
Frontally bolted telescopic rails.
The rails are provided with a linear alignment possibility to ensure also an
adjustment to different rack depths.
No support of the cable management (delivered with the mounting kit).
Climatic conditions.
For the ventilation of the installed server a large extent unhindered air intake
in the rack front and air discharge in the rear cover of the rack are necessary.
1 rack front side
2 rack rear side
A rack depth (comparison PRIMECENTER Rack 940/1000 mm)
B rack width (comparison PRIMECENTER Rack 700 mm)
C clearance of the 19-inch installation level
C1 front 19-inch installation level
C2 rear 19-inch installation level
D area for cable routing (cable area depth) and ventilation
E area for front panel and ventilation
F right and left area for support systems
P PRIMERGY installation depth
a1 front left support upright
a2 front right support upright
b1 rear left support upright
b2 rear right support upright