TX150 S6 Options Guide 25
Preparation Rack model
4.2 Rack model
Ê Exit all applications and shut down the server properly.
Ê Press the On/Off button if the server has not been switched off by the
operating system.
Ê Pull all power connectors out of the power outlets.
4.2.1 Opening the server
Figure 7: Loosening the knurled screws
Ê Loosen the four knurled screws (1) and pull the server as far as possible out
of the rack (2).
1
2