6. OPERATION NOTES
- 152 -
April 20, 2015
SX-3000 Standalone Integrated Media Block™ with
Portable Storage/ Enterprise Storage User Manual
6. OPERATION NOTES
6.1. Power Up Sequence
Always power up any external storage (Portable Storage/ Enterprise Storage or external NAS)
before powering up the projector. The external storage must be powered up first to be correctly
identified by the SX-3000.
6.2. Power Down Sequence
Always power down the SX-3000 and projector with the following steps:
1. Power down the SX-3000 by using the SMS -> Shutdown button.
2. Power down the projector after the SX-3000 is powered down.
3. Power down any external storage attached to the SX-3000.