EasyManua.ls Logo

GE AKTA ready - Page 136

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Running the column efficiency
test
A column efficiency test is started by clicking Start in the UNICORN Result Name panel
in the Start Protocols dialog box displayed immediately after finishing the installation
wizard. The test is performed using 100 cm/h liquid velocity and normally takes approx-
imately 30 minutes.
If column conditioning is included in the test, it will take longer time than 30
minutes.
Tip:
Similar to a component test, it is possible to enter notes during the test (see Running the
component test, on page 112).
For more information about efficiency testing of columns see the application note Effi-
ciency test of ReadyToProcess columns (see Section 1.3 Associated documentation, on
page 12).
136 ÄKTA ready Operating Instructions 28960345 AD
9 Column installation
9.3 Optional column test

Table of Contents

Related product manuals