EasyManua.ls Logo

GE AKTA ready - Page 137

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test results
Results from an efficiency test are stored and processed in a similar way as results from
a component test. The results are stored at a user-defined location, and they can be
compiled and presented in the form of a printed report using report format
AKTA ready_Column_T, which includes results from the efficiency test in addition to the
installation information in report format AKTA ready_Column.
In addition to the general information, a column test report also contains detailed infor-
mation about the column used (e.g., volume, technique, max and default flow rates, etc.).
A column test report contains a chart showing the peak in UV response caused by the
progressing pulse of tracer solution, together with suggested acceptance criteria.
Unlike a component test report, a column test report does not state whether
a column has passed or failed a test. Instead, it is the responsibility of the user
to compare the test results with provided acceptance criteria in order to decide
if the test was successful or not.
Note:
ÄKTA ready Operating Instructions 28960345 AD 137
9 Column installation
9.3 Optional column test

Table of Contents

Related product manuals