EasyManua.ls Logo

GE AKTA ready - Page 174

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prime the system
Before starting a run, make sure that the flow path, including hoses to inlet containers,
are filled with liquid and that no air bubbles remain in the system.
The air trap can only remove small amounts of air. If air reaches the flow meter during
a run, the alarm “Uncertain flow“ will be displayed and the system will enter pause mode.
Priming should be done for each inlet, starting with inlet 1. Use the ManFlow command
to control the pump during priming.
174 ÄKTA ready Operating Instructions 28960345 AD
11 Run a method
11.1 Final preparations before a run

Table of Contents

Related product manuals