pH calibration
Perform a pH calibration as described in pH calibration, on page 186. In the table below,
enter the recorded pH values after calibration.
RemarkpH 7pH 4Component
AE-121
Installation test method performance
Perform a component test as described in Chapter 8 Component test, on page 107. The
test result (printed report) is attached to the ITR and filed in the customer log book.
RemarkOK/
Not OK
Component
UV
Conductivity
Flow
Pressure sen-
sors
System serial number:
Installation preformed by:
Date:
Installation accepted:
220 ÄKTA ready Operating Instructions 28960345 AD
14 Reference information
14.6 Checklists