EasyManua.ls Logo

GE LOGIQ 5

GE LOGIQ 5
452 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
DIRECTION 2300000, REVISION 2 LOGIQ™5 SERVICE MANUAL
8-14 Section 8-3 - Monitor
8-3-6-4 Removal Procedure (cont’d)
2.) Disconnect two (3-4) connectors. Refer to Figure 8-16.
3.) Unscrew two (5-6) screws to remove the TaskLamp Assy. Refer to Figure 8-17.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-3-6-5 Mounting procedure
Install the new parts in the reverse order of removal.
Figure 8-16 Disconnect two connectors
Figure 8-17 Unscrew two screws
Table 8-7 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2300000, Rev 1+, Section 8-3-6. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-2-1
Task Lamp Assy
Section 10-5-5
Physical Inspection
3
4
5
6

Table of Contents

Related product manuals