GE MEDICAL SYSTEMS
DIRECTION 2300000, REVISION 2 LOGIQ™5 SERVICE MANUAL
8-14 Section 8-3 - Monitor
8-3-6-4 Removal Procedure (cont’d)
2.) Disconnect two (3-4) connectors. Refer to Figure 8-16.
3.) Unscrew two (5-6) screws to remove the TaskLamp Assy. Refer to Figure 8-17.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-3-6-5 Mounting procedure
Install the new parts in the reverse order of removal.
Figure 8-16 Disconnect two connectors
Figure 8-17 Unscrew two screws
Table 8-7 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2300000, Rev 1+, Section 8-3-6. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-2-1
Task Lamp Assy
Section 10-5-5
Physical Inspection
3
4
5
6