GE MEDICAL SYSTEMS
DIRECTION 2300000, REVISION 2 LOGIQ™5 SERVICE MANUAL
8-100 Section 8-7 - PCB Boards
8-7-5-4 Removal Procedure (cont’d)
7.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-7-5-5 Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-47 Functional Tests
Service Manual
Section Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2300000, Rev 1+, Section 8-7-5. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown