2026265-075C Solar 8000M/i patient monitor 4-37
Maintenance and checkout: Maintenance Checklist
Maintenance Checklist
Use the following checklist to ensure maintenance completion.
“Visual inspection” on page 4-3
1. ____ General
2. ____ Connectors
3. ____ Display
“Cleaning” on page 4-4
1. ____ Exterior cleaning
2. ____ Cleaning the display
3. ____ Cleaning the touch screen display
4. ____ Cleaning disinfecting and storing GE ECG cables and leadwires
“Electrical safety tests” on page 4-8
1. ____ Power outlet test
2. ____ Ground (earth) integrity
3. ____ Ground (earth) wire leakage current tests
4. ____ Enclosure leakage current test
5. ____ Patient (source) leakage current test
6. ____ Patient (sink) leakage current test
“Checkout procedure” on page 4-16
1. ____ Solar 8000M/i Unity View display
2. ____ Touchscreen
3. ____ Tram-rac housing
4. ____ M-Port
5. ____ TRAM-NET interface or communication
6. ____ Unity Network MC network
7. ____ Keypad/remote control
8. ____ Unity Network ID
9. ____ Printer