156
Number
Parameter
Description
LVRT
1
Ride Through Voltage
Start Point
The inverter will not be disconnected from the
utility grid immediately when the grid voltage is
between Ride Through Voltage Start Point and Ride
Through Voltage End Point.
2
Ride Through Voltage
End Point
3
Ride Through Time Start
Point
Indicates the longest duration the inverter can
remain connected to the grid when the grid voltage
is at the Ride Through Voltage Start Point.
4
Ride Through Time End
Point
Indicates the longest duration the inverter can
remain connected to the grid when the grid voltage
is at the Ride Through Voltage End Point.
5
Ride Through Trip
Threshold
LVRT is allowed when the grid voltage is lower than
Ride Through Trip Threshold
HVRT
6
Ride Through Voltage
Start Point
The inverter will not be disconnected from the
utility grid immediately when the grid voltage is
between Ride Through Voltage Start Point and Ride
Through Voltage End Point.
7
Ride Through Voltage
End Point
8
Ride Through Time Start
Point
Indicates the longest duration the inverter can
remain connected to the grid when the grid voltage
is at the Ride Through Voltage Start Point.
9
Ride Through Time End
Point
Indicates the longest duration the inverter can
remain connected to the grid when the grid voltage
is at the Ride Through Voltage End Point.
10
Ride Through Trip
Threshold
HVRT is allowed when the grid voltage is higher
than Ride Through Trip Threshold