EasyManua.ls Logo

Goodwe GW10K-ES-C10 - Page 50

Goodwe GW10K-ES-C10
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
LX U5.4-20: Floor-mounted Installation
NOTICE
If parallel use is required, check and select batteries with similar production dates and
numbers to use together.
Step 1: Secure the unlocking bracket to the battery.
Step 2: Keep the battery parallel to the wall and ensure that the unlocking bracket is tightly attached
to the wall. Ensure secure placement, mark the drilling position with a marker pen, and remove the
battery.
Step 3: Use an impact drill to drill holes in the wall.
Step 4: Tighten the expansion screw.

Table of Contents

Related product manuals