9.4 Recommissioning
For recommissioning, follow the steps described for commissioning.
After cleaning work on the product or a downtime of one to four weeks,
carry out the following jobs:
• Check the lubrication system Ü287
• Check lubrication film on rails and racks and pre-lubricate if necessary
If the machine downtime is longer than four weeks, carry out the following
jobs:
• Pre-lubricate rails and racks Ü2111