• Check lubrication system according to separate documentation on lubrica-
tion system
If the machine downtime is longer than one year, carry out the following
tasks:
• Rinse the lubrication lines with fresh lubricant
• Replace the lubricating elements and lubricating pinion
• Replace lubricant cartridge
Decommissioning, storage OPERATING MANUAL Lubrication system FlexxPump4D
9007202674126091_v2.0_EN-US
112