EasyManua.ls Logo

HAIMER Basic - Switching the Devices off

HAIMER Basic
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
Operating Manual
POWER CLAMP
English
Quality Wins.
© 2021/09 Haimer POWER CLAMP
Operation
5.5 Switching the devices off
In daily use of the units:
Switch off both devices are work, using the mains switch.
Clean the shrink fit machine as required
(see section "Service and maintenance“).
For longer periods of disuse:
Switch off both devices with the mains switch.
Disconnect the power cables for both.
Clean the shrink fit machine (see section 5).
Top up the water tank of the SPEED COOLER. The cooling coil in the water tank must be com-
pletely covered.

Table of Contents