EasyManua.ls Logo

HEIDENHAIN ITNC 530 - CYCLE PROGRAMMING - Working with the Secondary Axes U;V;W

HEIDENHAIN ITNC 530 - CYCLE PROGRAMMING
513 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52 Using Fixed Cycles
2.1 Working with Fixed Cycles
Working with the secondary axes U/V/W
The TNC performs infeed movements in the axis that was defined in
the TOOL CALL block as the spindle axis. It performs movements in
the working plane only in the principal axes X, Y or Z. Exceptions:
You program secondary axes for the side lengths in cycles 3 SLOT
MILLING and 4 POCKET MILLING
You program secondary axes in the first block of the contour
geometry subprogram of an SL cycle
In Cycles 5 (CIRCULAR POCKET), 251 (RECTANGULAR POCKET),
252 (CIRCULAR POCKET), 253 (SLOT) and 254 (CIRCULAR SLOT),
the TNC machines the cycle in the axes that you programmed in the
last positioning block before the cycle call. When tool axis Z is active,
the following combinations are permissible:
X/Y
X/V
U/Y
U/V

Table of Contents

Related product manuals