4.4 Step Voltage Test
94
When 5 minutes has passed in total,
measurement automatically stops.
The voltage application time is adjustable.
See 6.2 "Changing and Checking Voltage Appli-
cation Time for Step Voltage Test" (page 126).
The voltage application time cannot be
varied for each step.
4.4.1 Setting and Conducting a Step Voltage
Test
Procedure
1. Press the key in standby state,
and the voltage indication will blink.
2. Press the key to choose
[STEP2.50 kVSET] or [STEP5.00
kVSET].
The voltage value will advance rapidly if
the key is held down.
Choosing [
5.00 kVSET] with the key
and then pressing the key is a short-
cut to select STEP.
STEP5.00 kV
1 kV
2 kV
3 kV
4 kV
5 kV
1 min. 2 min. 3 min. 4 min. 5 min.
Measurement
(1)
Measurement
(2)
Measurement
(3)
Measurement
(4)
Measurement
(5)
End of
Measurement