2 Unit installation
SMGB0077 rev.0 - 01/2013
37
2
S
space around the unit for installation and maintenance.
Install a service hatch near the pipe connection area and electrical junction box for installation and maintenance work.
1. Piping connection.
2. Wall.
3. Service access panel.
Check that the ceiling surface where the air panel is to be installed is completely horizontal.
Check that the drain hose can be installed maintaining the necessary down-slope.
Installation
Cut the area of the unit in the false ceiling and reinforce the
opening made.
Install the M10 (3/8”) suspension bolts depending on the
type of surface:
Model A (Opening) B (Suspension)
RCD-1.0
1060 890
RCD-1.5
RCD-2.0
RCD-2.5
RCD-3.0
RCD-4.0
1620 1450
RCD-5.0
1 Suspension
2 Panel
3 Wireless receiver
4 Piping
540mm
670mm
A
B
1
2
4
4
3
Concrete beams
1 150 to 160 mm
2 Steel
3 Anchor bolt (W3/8 or M10)
4 Concrete
5 Insert (100 to 150 kg)
1
2
3
4
5

Table of Contents

Other manuals for Hitachi RPI-2.0FSN4E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi RPI-2.0FSN4E and is the answer not in the manual?

Hitachi RPI-2.0FSN4E Specifications

General IconGeneral
BrandHitachi
ModelRPI-2.0FSN4E
CategoryAir Conditioner
LanguageEnglish

Related product manuals