CIPer
TM
MODEL 50 CONTROLLER – INSTALLATION AND COMMISSIONING INSTRUCTIONS
Controller Performance
The controller performance has been tested in two test scenarios.
NOTE
These are example scenarios. It is therefore, of course, possible for you to use any other mix
of Panel Bus points and BACnet MS/TP points as long as the maximum number of hardware
I/O points (see section "Panel Bus Considerations" on pg. 46) is observed..
Table 26. Performance test 1 (simple statement for the COV updates, no HVAC application)
No. of
hardware
I/O points
OK for non-
critical
applications
(C
BACnet MS/TP
(via RS485-2)
(A
9x 821A, 9x 822A, 9x 823A, 9x 824, 5x 825, 5x 830A
(B
Four (4) PX pages: AI, AO, BI, and BO points each in a dedicated PX page per point type
(C
About 0.5% of the BACnet MS/TP point updates are occasionally delayed.
(D
One (1) PX page with all points
Table 27. Performance test 2
Max. no. of COV updates per min. across
RS485-1 and RS485-2 together
BACnet MS/TP at
38,500 bps
25…35%
(occasionally:
60%)