EasyManua.ls Logo

HP Integrity Superdome SX1000 - Page 83

HP Integrity Superdome SX1000
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
Installing the System
Booting and Verifying the System
71
Step 2. At the “Select Device” prompt, enter B then the cabinet number to check the power status of the
cabinet. Observe that the Power Switch: on and Power: enabled as shown in Figure 2-51.
Figure 2-51Power Status Window
Figure 2-51 shows that cells are installed in slots 0 and 4. In the cabinet, there should be cells
physically located in slots 0 and 4.
Step 3. Enter ps from the Command Menu, or if proceeding from Step 2.in the previous section, simply
press
<CR> one more time to observe the status as shown in Figure 2-52.
Figure 2-52Power Status Showing State of UGUY LEDs (and other status)

Table of Contents

Other manuals for HP Integrity Superdome SX1000

Related product manuals