EasyManua.ls Logo

HP Integrity Superdome SX1000 - Page 88

HP Integrity Superdome SX1000
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
Installing the System
Performing a Visual Inspection and Completing the Installation
76
Figure 2-55Front EMI Panel Flange and cabinet Holes
2. Position the panel at the top lip and lift the panel up while pushing the bottom into position.
The EMI gasket may have to be compressed to get the panel to seat properly.
3. Reattach the screw at the top of the EMI panel.
Hole
Flange
See Detail

Table of Contents

Other manuals for HP Integrity Superdome SX1000

Related product manuals