EasyManuals Logo

HPE FlexFabric 5710 Series User Manual

HPE FlexFabric 5710 Series
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
11
Figure 11 Attaching the mounting brackets and chassis rails to an HPE 5710-54HF switch
(mounting brackets installed near the power supply side)
Figure 12 Attaching the mounting brackets and chassis rails to an HPE 5710-54HT switch
(mounting brackets installed near the power supply side)
Figure 13 Attaching the mounting brackets and chassis rails to an HPE 5710-30HT switch
(mounting brackets installed near the power supply side)
Connecting the grounding cable to the chassis
CAUTION:
Select grounding points as required. The primary grounding point and auxiliary grounding point are
located on the left side panel. If you use one of these grounding points, you must connect the
grounding cable to the grounding point before you mount the switch in the rack.
This section uses the primary grounding point on the HPE 5710-54HF switch as an example.
To connect the grounding cable to a grounding point:
1. Choose a grounding point. As a best practice, use the grounding point close to the mounting
brackets.
2. Unpack the grounding cable and grounding screws.
You can use the cable and screws shipped with the switch for connecting to the primary
grounding point or auxiliary grounding point.

Table of Contents

Other manuals for HPE FlexFabric 5710 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HPE FlexFabric 5710 Series and is the answer not in the manual?

HPE FlexFabric 5710 Series Specifications

General IconGeneral
ModelHPE FlexFabric 5710 Series
Power SupplyAC or DC
Operating Temperature0°C to 45°C
Routing ProtocolOSPF, BGP, RIP
Input Voltage100-240V AC
Operating Humidity10% to 90% (non-condensing)
Jumbo Frame SupportUp to 9216 bytes
ManagementCLI, SNMP

Related product manuals