2.1 Preparing Tools and Meters
This section describes the tools and meters that are required before installation.
Marking pen Phillips screwdriver (M3 to
M6)
Flat-head screwdriver (M3 to
M6)
Diagonal pliers
Combination wrench
(capacity 32 mm)
Socket wrench Torque wrench
Power cable crimping tool RJ11 crimping tool Cable cutter
Rubber mallet Soldering iron Wire stripper
Hammer drill (Ø16) Heat gun Level
Multimeter Measuring tape Vacuum cleaner
2.2 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
BTS3900A(Ver.B)
Installation Guide 2 Preparing for Installation
Issue 01 (2011-10-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3

Table of Contents

Other manuals for Huawei BTS3900A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei BTS3900A and is the answer not in the manual?

Huawei BTS3900A Specifications

General IconGeneral
BrandHuawei
ModelBTS3900A
CategoryAccessories
LanguageEnglish

Related product manuals