15 Subsequent Operations
About This Chapter
After the base station is installed and checked, you need to obtain the ESN, seal the cable outlet
of the base, and then repair the damaged paint.
15.1 Sealing the Cable Holes on the Base
After all the cables are installed, you need to seal the cable holes of the base.
15.2 Applying Touch-Up Paint
The paint on the surface is intact. If any paint is damaged, you must apply touch-up paint to
avoid erosion.
BTS3900A(Ver.B)
Installation Guide 15 Subsequent Operations
Issue 01 (2011-10-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
156