EasyManua.ls Logo

Huawei E9000 - Page 84

Huawei E9000
189 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 3-38 Slot numbers of the CH240, CH242, CH225 V3, CH226 V3, CH242 V3, CH242
V3 DDR4, CH225 V5, CH242 V5
Figure 3-39 Slot numbers of the CH220, CH221, CH222, CH220 V3, CH222 V3, CH221 V5
l A maximum of eight full-width compute nodes can be installed in an E9000 chassis.
l You are advised to install compute nodes from bottom to up by following the slot numbers in
ascending order.
Step 3 Remove the filler panel.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30) Copyright © Huawei Technologies Co., Ltd. 74

Table of Contents

Other manuals for Huawei E9000

Related product manuals