Figure 7-6 Installation positions of transport fasteners on the top of the UPS
cabinet and SmartLi
(1) SmartLi (2) UPS cabinet
(3) Transport fastener
Procedure
Step 1 Remove the transport fasteners on the top of IT cabinets and smart cooling
products.
1. Remove the rubber plugs using a screwdriver and remove the side panels for
sealing plates.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 7 Removing Transport Protection Materials
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 64