Figure 5-34 Pulling out the BCU
Step 2 Install battery modules and ller panels.
If half-capacity cabinet conguration is adopted, battery modules can be installed only on
the left side. Install ller panels at the empty positions for battery modules. Install a ller
panel at the last but one layer of the right column only after installing battery
communications cables.
Figure 5-35 Installing battery modules and ller panels (8+8 and 8+0 scenarios)
SmartLi 3.0
User Manual (Short-Term Backup Power) 5 Installation and Cable Connection
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 87