5.1.2 Initial Startup
If the equipment is started for the rst time, obtain authorization for the
equipment and set related parameters on the Settings Wizard screen. If the
equipment is not started for the rst time, skip this section.
Step 1 Enter the startup password obtained through the app on the service authorization
page to complete device authorization.
Technical support engineers can obtain the service authorization code through the
app. For details, see the
Data Center Facility Deployment Guide
.
Step 2 Set the language, date, time, network parameters, system parameters, and battery
parameters on Settings Wizard.
Set system parameters with caution. Incorrect setting may aect the normal UPS
operation.
● Set Single/Parallel after double check. Incorrect settings may aect the UPS
operation.
● Output voltage level refers to the line voltage level. Set it based on site
requirements.
● Set Output frequency correctly. Otherwise, loads may be aected and the UPS
may not work properly.
● Set all battery parameters correctly based on site requirements. Battery
parameter settings are critical to battery maintenance, battery lifespan, and
UPS discharge time.