3.3 Startup Procedure Checklist
NOTE: There are no controller to mold interconnection details included in this User Guide. If
this information is required, please call the nearest Husky Regional Service and Sales
office.
WARNING!
Trip hazard – risk of death or serious injury. Make sure that all the cables between the
controller and all the external devices and/or equipment are marked clearly. Or route
the cables so that no one will trip over the cables.
Item Step
1 Connect power/thermocouple cables between the mold and controller (if
required).
2 Connect the I/O box or option cables (if required).
3 Connect the controller to the power source.
4 Switch the controller ON.
5 Login to the system (if required).
6 Select the required mold setup.
7 Verify that the mold setup is the correct. Check the name and setpoints in the
preview window.
8 Correct any faults found during diagnostics.
9 Touch START to run the system.
10 Check that the controller is functioning correctly by monitoring the Neo2 View
or the Text View screens.
IMPORTANT!
When turning off the system, wait 30 seconds before turning the main disconnect
switch back on. Turning the system off and on incorrectly may result in system
communication problems.