3-1: System Operation
3 - System Operation
START-UP PROCEDURE
Perform all daily and periodic maintenance as specied in Section 1. 4 of this Owner’s
Manual.
Connect a garden hose to supply water to the truckmount. If used, turn the “PUMP-IN” 2.
switch to the “ON” position.
The water box must be full prior to starting the truckmount.
Connect the cleaning tool to the length of hose required to perform the cleaning 3.
job.
Turn the key to “ON”. Pull the choke and start the truckmount with the throttle cable
4.
fully depressed (“IDLE” position.)
After the engine starts, push the choke in and allow the truckmount to run in “IDLE” 5.
for 2 - 3 minutes to warm up.
Pull the throttle cable to full extension and twist the handle clockwise to lock.
6.
Set the temperature to the desired level on the “TEMPERATURE” knob.7.
If used, turn the “AUTO PUMP-OUT” switch to the “ON” position.8.
Water Box
Optional
Pump-In Switch
Choke
Throttle
Location of Throttle, Choke, Optional Pump-In Switch and Water BoxFigure 3-1.