4230 Flow Meter
Appendix B Programming Worksheets
B-4
20. Mann. U-channel: Slope = __.____Rough = __.____
21. Mann. U-channel: Width = __.____ Feet (or meters)
22. Mann. Rectangular: Slope = __.____ Rough = __.____
23. Mann. Rectangular: Width = __.____ Feet (or meters)
24. Mann. Trapezoid: Slope = __.____ Rough = __.____
25. Mann. Trapezoid: Top Width = __.____ Feet (or meters)
26. Mann. Trapez.: Bottom Width = __.____ Feet (or meters)
27. Select Data Set: One, Two, Three, Four, (None)
28. Level Units For Data Point Entry: Ft., In, M, Mm
29. Flow Rate Units: GPM, GPS, MGD, CFS, CFM, M
3
S, M
3
H,
M
3
D, LPS, CFD, GPH, AFD, CFH, CFM, M
3
M
30. Set __(1-4): (0) Points Entered: Add Point, (units)
31. Set 1 Data Point 1: Enter: __.____ (level units) __.____ (vol-
ume units)
32. Set __(1-4): __(1-50) Pointes Entered: (Use), Edit Point,
Add Point, Clear, Print_________________________
33. Set__(1-4) Data Point __(1-50) Enter: __.___(level units)
__.___(volume units)
Enter data points in the table below. If you have multiple data
point sets, photocopy this table.
Data Point Set
34. Flow Metering Inserts: Select Weir/Orifice Type: V-notch,
Round________________________________
35. Select Insert size: 6”, 8”, 10”, 12”___________________
Enter Maximum Head
36. Maximum Flow: ___._____ (units of measure)
Level Flow Level Flow Level Flow Level Flow