EasyManua.ls Logo

JETStream X Series - Breaking in New Packing; Using the Hydro-Throttle (Dump System Only)

JETStream X Series
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
X-Series Waterblast Unit
Stopping the Unit
1. Open the bypass valve by turning coun-
ter-clockwise four full turns to relieve the
system pressure. Monitor the gauge to
ensure system pressure is at zero.
2. Decrease the engine speed to idle and
disengage the clutch by pulling the lever
towards the pump.
3. Allow the engine to operate for 4-5 min-
utes before stopping. This allows the
engine turbocharger to properly cool.
When the temperature shown on the
control panel decreases to approximately
176°F (80°C), it is safe to turn off the
engine.
4. Turn the key switch to the OFF position.
WARNING
!!
Do not idle the engine for more than 5 minutes.

Table of Contents

Related product manuals