EasyManua.ls Logo

Kamstrup 162M - Setup plan for load control 1 and 2

Kamstrup 162M
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TECHNICAL DESCRIPTION Kamstrup 162M/382M
5512-1040 GB/05.2012/Rev. C1
63
10.4.3 Setup plan for load control 1 and 2
If the meter is installed with a load control module, it can be configured to include a plan for the switching
between active and inactive. A separate plan can be made for both relays.
The load control can also be configured to follow the tariff. For each tariff that are defined in the tariff plan, it shall
be defined whether the relay shall be active or inactive.

Table of Contents

Related product manuals