SANARIUM B, S
PAGE 37
50701206/02.18
9. Operation
9.10. SANARIUM S - Preparing the evaporator
1. Open the angle valve (1) for the water inlet.
2. Switch on the illuminated switch (2) on the
evaporator.
Once the evaporator is ready, the green
OPERATION LED lights up.
If the yellow or red LED (3) lights up:
Carry out maintenance as described on
page 60.
1
3
2
The controller automatically switches
the evaporator on.
Birmingham scent dispenser
1. Check the fill capacity on the scent
container (4).
. Replace the scent container.
' See ”Cleaning and maintenance” - page 61.
4