SECTION 2
INSTALLATION
Jan 2001
Page 2-3
05114574
2.1.2 Seller Obligations
If KMT Waterjet is requested, the following tasks will be the responsibility of the
KMT Waterjet technician at installation.
Insure site preparation is satisfactory.
Remove internal strapping and blocking material.
Insure that power is connected prior to equipment turn on.
Insure that connections have been made for water and pneumatic service.
Test motor rotation direction and correct if necessary.
Check and test electrical signal connections between intensifier pump and
cutting area.
Power up and check out pump (and cutting station, if supplied by KMT
Waterjet) for proper operation.
Set boost pump discharge pressure.
Install and test high pressure plumbing.
Follow the standard test procedure to insure satisfactory performance.
Train maintenance personnel in the performance of maintenance and repair
procedures.
Sign off the installation and testing on the KMT Waterjet standard
acceptance document.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KMT STREAMLINE SL-IV 100 and is the answer not in the manual?

KMT STREAMLINE SL-IV 100 Specifications

General IconGeneral
BrandKMT
ModelSTREAMLINE SL-IV 100
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals