EasyManuals Logo

KMT STREAMLINE SL-IV 100 User Manual

Default Icon
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
SECTION 3
OPERATION
Nov 2002
Page 3-6
05114582
3.3.1 Initial Pump Start Up Checks
The following checklist should be reviewed before turning on the unit.
Verify all interface connections have been made.
Verify all safety circuits are connected and operational.
Make sure the oil tank (1) is full, check the sight glass (2) located on the side
of the tank. If oil is needed, remove cap (4) and pump oil through fill port
(3).
Insure all cooling water valves, supply water valves, and high pressure
valves are open.
Check direction of motor rotation arrow (5).
Motor direction of rotation should be checked any time
electrical maintenance/modification is performed on the
motor starter wiring or on the service wiring to the pump.
Failure to verify correct motor rotation can result in costly
damage to the hydraulic pump.
CAUTION
!

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KMT STREAMLINE SL-IV 100 and is the answer not in the manual?

KMT STREAMLINE SL-IV 100 Specifications

General IconGeneral
BrandKMT
ModelSTREAMLINE SL-IV 100
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals