EasyManua.ls Logo

Krone Round Pack 1550 - Vent Overload Coupling on the PTO Shaft

Krone Round Pack 1550
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XI - 2
Return to Service
11.2 Vent Overload Coupling on
the PTO Shaft
(friction clutch only)
Following extended downtimes, overload coupling
surfaces (2) may stick to the contact surfaces. Vent
the overload coupling before use.
Undo the bolts (1) crosswise.
Turn the PTO shaft manually.
Tighten the bolts crosswise.
KR-0-151
1
1
2
Following extended downtimes check the smoothness in
operation of all components of the bale density indicator
and make sure that the mechanism is not dirtied.
For this:
Clean rope guide tube (1) at regular intervals.
Check cross shaft (2) and guide pin (3) for smooth
operation and clean if required.
RP-5-004
2
1
3

Table of Contents

Related product manuals