EasyManua.ls Logo

KUHN MAXIMA 2 M - Coupling the Machine

KUHN MAXIMA 2 M
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Precision Seed Drills
40
MAXIMA 2 M
Putting into service
Coupling the machine
- Position hitch bar closest to the semi-automatic
attachment.
- Remove lynch pins (1) (1 on each machine side).
- Raise tractor lower links to engage hitch bar (1) in the
machine's semi-automatic attachment (2).
- The lock (3) automatically engages.
- Insert and lock lynch pin (4). (1 on each machine
side).
- Attach top link with hitch pin.
- Use tractor and machine attachment holes to adjust
the top link position.
- Raise machine using the tractor lift linkage until
parking stands no longer rest on the ground.
To obtain optimum PTO shaft angles and
tractor lift capacity, the top link must be
parallel to the lower links or slightly pointing
downwards towards the tractor.

Table of Contents

Related product manuals