Instructions for transport
Precision Seed Drills
MAXIMA 2 M
49
$Instructions for transport
1. Putting the machine into transport
position
From the working position:
If the machine is not fitted with a fertilizer or if the
machine is fitted with a fertilizer with a 950 L
(251 US gal) hopper:
- Activate cylinders to fold side markers.
- Lock side markers using valves (1) (1 on each
marker).
Depending on the marker length adjustment:
- Position pin (1) in lower hole (2).
Before placing the machine into transport
position:
Wait until the rotating parts have come to a
complete stop.
This position enables leaving the marker disks
(3) pointing outwards.