Precision Seed Drills
52
MAXIMA 2 M
Instructions for work
$Instructions for work
1. Putting the machine into work
position
From the transport position:
If the machine is fitted with a fertilizer with
2 x 190 L (2 x 50 US gal) hoppers or
2x260L(2x67US gal) hoppers:
- Lower tractor lift linkage to position the machine near
to the ground.
- Remove tube clip (1).
- Position side marker disk on the machine outside.
- Insert and lock tube clip (1).
Repeat procedure for the other marker.
- Unlock side marker valve (1). (1 on each marker).
- Deploy the right or left side marker.
The machine is in working position.
Before placing the machine in working
position:
- Check that nobody is within the machine
pivoting area.
- If there is someone, make sure the
person moves away.