Commissioning
Before initial switch-on
34
Lenze · E84AYCER communication module (PROFINET) · EDS84AYCER EN 3.0 - 02/2019
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 Commissioning
During commissioning, system-related data such as motor parameters, operating parameters, re-
sponses, and parameters for fieldbus communication are defined for the inverter. For Lenze devices,
this is done via the codes.
The codes of the inverter and communication are saved non-volatilely as a data set in the memory
module.
In addition, there are codes for diagnosing and monitoring the stations.
Parameter reference
( 85)
6.1 Before initial switch-on
Stop!
Before switching on the standard device together with the communication module,
check the entire wiring for completeness, short-circuit, and earth fault.