D9U001MCX-0101_03
30
8 Putting into Service
WARNING!
Risk of injury when working on the bed!
► Ensure that the bed is disconnected from the mains connection prior to putting into service, putting out of service
and maintenance.
► Ensure that the castors are locked prior to putting into service, putting out of service and maintenance.
CAUTION!
Material damage due to incorrect putting into service!
► Ensure that putting into service is performed exclusively by manufacturer´s customer service or trained hospital
personnel.
CAUTION!
Material damage due to temperature dierence!
► If there is a considerable temperature dierence between the bed and the place of operation (after transport/sto-
rage), leave bed unconnected for 24 hours for the dierence to balance itself.
NOTE For safe, easy handling, LINET ® recommends having two technicians put the bed into service.
Set up the bed as follows:
► Unpack the bed.
► Check the delivery (see Scope of Delivery and Bed Variants).
► Remove isolating foil from the mains control box (see Accumulator Activation).
► Install equipment and accessories.
► In case of delivery with dismantled head board and foot board, mount the head board and foot board (see Head Board and
Foot Board).
► Set up the bed exclusively on a suitable oor surface (see Transport).
► Ensure that the mains cable is not in collision with something and it is not stretched when adjusting the bed.
► Check that the plug is inserted correctly.
► Do not leave any extension cords or power strips loose on the oor.
► Ensure that all of the required mechanical and electrical prevention mechanisms are available on site.
► There is no mains switch on the bed, i.e. the mains cable is the only means to isolate the bed from the mains. Ensure that
the mains cable is always accessible.
► Have the separable plug of the mains cable changed and maintained exclusively by qualied and trained service techni-
cians authorised by the manufacturer.