Lucent Technologies -48V CPS4000/CPS4000 PLUS Cabinet Power System
5 - 24 Installation and Testing Issue 13 December 2000
Initial Start-up and Test
Checklist Refer to Section 7 and the Glossary for a description of the parameters
cited in this section.
Verify that all ac service circuit breakers are Off or ac fuses are
removed.
Verify that all output distribution circuit breakers are Off or output
distribution fuses are removed.
If provided, verify that the LVD unit (BSP2 or BSP2C) and the
control unit are seated firmly in the initial shelf.
Remove the distribution unit (BSP2 or BSP2C) cover.
Verify that the battery, if installed, is disconnected.